Industrial & Warehouses — Slabs, Docks & Envelope Trades
Distribution centers, cold storage, and warehouse shells run on heavy slabs, tight dock tolerances, and metal-building envelopes. CRC bids these trade scopes clean into industrial GCs and developers.
Where CRC plugs in
CRC works underneath your industrial GC or design-build partner as a specialty trade subcontractor. We self-perform warehouse slab-on-grade, dock pit pours, low-voltage cabling for security and rack systems, spray foam and batt insulation, and full-project dump bin and sanitation programs.
CRC does not bid industrial warehouses as a prime GC. We plug into the industrial GC or developer already leading the project.
Scope Highlights
Warehouse slab-on-grade with F-number floor flatness targets
Dock pit and truck apron pours, bollards, and dumpster pads
Low-voltage backbone for CCTV, access control, warehouse Wi-Fi, and rack-mounted systems
Closed-cell spray foam and batt insulation for pre-engineered metal buildings
Roof-deck foam for thermal upgrades on existing warehouses
Roll-off dump bin service scaled to demo, shell, and turnover phases
Typical Timeline
Bid & Takeoff
1–2 weeks
Slab tolerance review, mix design, envelope R-value confirmation, sanitation program sizing.
Mobilization
3–7 days
Site logistics with GC, dumpster placement, laydown, and safety orientation.
Execution
6–20 weeks
Slabs sequenced with steel erection and MEP, envelope work after dry-in.
Closeout
1–2 weeks
F-number testing, thermal reports, warranty documents, final haul-off.
Durations vary by scope size, weather, permitting, and GC schedule. Numbers reflect typical CRC scopes on Louisiana projects.
Example Outcomes
Representative industrial & warehouses scopes CRC has executed as a specialty trade partner.
Distribution Center Slab
Kenner, LA
Scope
220,000 SF slab-on-grade with FF/FL flatness targets, dock pits, and exterior truck apron.
Result
Achieved F-number targets on first survey; rack installer mobilized on schedule.
Cold Storage Envelope Upgrade
Jefferson Parish, LA
Scope
Closed-cell foam on existing warehouse roof deck plus batt insulation on office mezzanine.
Result
Owner reported measurable reduction in refrigeration load within 30 days of commissioning.
Warehouse Security Cabling
St. Rose, LA
Scope
Low-voltage backbone for CCTV, access control, and rack-mounted wireless across 3-building campus.
Result
Single trade partner delivered cabling, spray foam, and sanitation on GC's turnkey subcontract.